Using Total Stations we can carry out:
  • Site surveys of existing buildings to allow draughtsmen to design new extensions
  • Pre-start site survey of holding down bolts and concrete levels
  • Concrete cores to ensure all pockets and embedment plates are in the correct positions
  • Survey embedment plates which give all the dimensions required so fin plates can be cut to the right length, correctly positioned and welded to the embedment plate
  • Survey the erected steelwork for plumb, line & level and then supervise the repositioning if required to ensure that the steelwork is within the tolerances set out in the national steelwork specification.
  • Surveys for pre-cast concrete stairs, panels and edge trim
  • Provision of specialist on-site fabrication and welding crews that provide all equipment to modify the steel to conform to the latest drawings

Using the latest software we are able to plot the survey results directly on to DWG type drawings to produce accurate professional “as built drawings” that can then be submitted for handover to the main contractor.
Arthur Hudson are experienced at working with erectors to solve problems during the steel phase & ensure that follow on trades are able to progress i.e. deckers /stud welders etc.
All crews carry relevant safety certification for working on-site.